18%
26.04.2012
: In LR-DIMMs, all of the signal lines (including the data) run through an intermediate chip; this reduces the electrical load on the memory controller.
LR-DIMMs have an Isolation Memory Buffer (iMB
18%
11.06.2014
was also available in the form of X.500, but it was not very widespread in practice. LDAP was originally designed as a protocol for X.500 services. This mutated into the LDAP directory servers that are seen
18%
07.11.2023
the last command as an example, an option to specify the extent size would be:
# vgcreate -s 8M vg0 /dev/sdb1 /dev/sdd
The -s 8M
option specifies a PE size of 8MB when the VG is created. You can change
18%
04.04.2023
, you are at the lower limits of the recommended setup with 200GB of disk space, 12GB of RAM, and four cores.
For the installation, download the ISO file mentioned earlier [4] to your virtualization
18%
09.06.2018
into dedicated hardware. This trend will only exacerbate with the arrival of 200/400-gigabit Ethernet (GbE) in 2019, and 800GbE shortly after that; hence, the window for CPU offload will remain open
18%
26.03.2025
than 4GB of RAM. If your setup is not too large, you should be able to back up the environment's new data and the metrics data history for around a year on 500GB. Debian GNU/Linux 12 is strongly
18%
01.10.2011
if the servers only run at 200W on average. Now, to address this, you could take the TDP down by 20W on each processor, allowing you to put 30 servers in the rack instead of 26. Because your average workload
18%
04.11.2011
, with 8,000 watts, you can fit 26 servers in the 42U rack because you can’t exceed the power budget – even if the servers only run at 200W on average. Now, to address this, you could take the TDP down by 20
18%
05.08.2024
://security.ubuntu.com/ubuntu noble-security/multiverse amd64 Packages [12.7 kB]
Get:10 http://security.ubuntu.com/ubuntu noble-security/main amd64 Packages [316 kB]
Get:11 http://archive.ubuntu.com/ubuntu noble/universe amd64 Packages [19.3 MB]
Get:12 http
18%
05.02.2023
.eu/one-step-closer-exascale-eurohpc-ju-and-forschungszentrum-julich-sign-hosting-agreement-exascale-2022-12-14_en) between the European High Performance Computing Joint Undertaking (EuroHPC JU