24%
05.12.2016
from one AS to another. For each prefix that needs to be accessible on the Internet, an entry must thus exist in the routing table of the other AS.
Three Steps to Success
The goal of the planned
24%
30.01.2020
want to implement automation for SUSE, CentOS, and Debian, you would theoretically have to create three boot environments: for AutoYaST, Kickstart, and preseeding.
FAI offers a mostly generic interface
24%
03.12.2015
Stack or VMware or bare metal provisioning, "cloud" really points at "elastic capability for infrastructure." So, on top of the elastic capability for infrastructure, now you need something that can be deployed
24%
30.01.2024
in three forms: as an add-in card (AiC) with a PCIe connector, as a solid-state drive (SSD) with a U.2 interface, or as SFX 3000, which allows vendors to build their own hardware with ScaleFlux features
24%
01.10.2011
-edge application. Let's not fail to mention the weeks of work that your top-dollar designers have tirelessly put in so they can break the mold and produce a ground-breaking website. You think that your job's done
24%
10.04.2015
a comprehensive menu structure after clicking on the Applications
button in the panel bar at top left. In addition to the usual menu groups, three distribution-specific subgroups can be found: Electronics
24%
25.03.2020
For some time now, Azure Active Directory (AAD) has been able to export sign-in and audit log data. The portal lets you export to the three Azure-based data sinks – Blob Storage, Event Hub, and Log
24%
12.09.2013
. These settings can be configured using ActiveSync device access rules.
The easiest way to define these settings is in the Exchange Control Panel, which you can access on https:///ecp
. The settings
24%
30.01.2020
Internet connection.
Solving a Problem
Assume you have a local Elasticsearch cluster of three nodes: a master node, which also houses Logstash and Kibana, and two data nodes with data on board (Figure 1
24%
13.06.2016
migration planning must be a top priority, and it must have the support of management.
The Right Perspective
If you are responsible for project planning, you need to think like a general: Do not just