18%
04.04.2023
or small businesses can use the package for free, but larger organizations need to purchase a license [3]. The commercial license also includes special features such as the Hardened Docker Desktop, which
18%
11.10.2016
between 64-bit versions for Red Hat Enterprise and Ubuntu. After downloading the 500MB DEB file, install it in the usual way from the Ubuntu Software Center and acknowledge any errors relating
18%
08.10.2015
---> Running in 259fb5959f4e
[...]
Step 3 : RUN yum install httpd -y
---> Running in 82dc46f6fc45
[...]
Step 4 : RUN bash -c 'echo "Hello again..." > /var/www/html/index.html'
---> Running in e1fdb6433117
---> d
18%
05.12.2019
2010. The last major update of OGMRip [3], which was developed for the Gnome desktop, also dates from 2015. The Thoggen [4] DVD transcoder is still available for download but has not seen any updates
18%
08.10.2013
November 1, 2013 is the deadline for entries in International Supercomputing Conference (ISC '14) Student Cluster Competition.
ISC '14 will be held in Leipzig, Germany on June 22-26, 2014
18%
18.06.2015
XC40 before the system is placed into regular service.
The Excalibur system comes with 101,184 processors, and the Stanford team had access to 22,00 of them. The team was working on a new scalability ... US Army’s Excalibur System Solves 10 Billion Equations in 3 Minutes
18%
25.08.2016
than fabricating 22,000 cables on site. The team also replaced the copper power cables with aluminum cables at some points, saving 20 percent in material costs.
Other institutions with Trinity
18%
18.04.2018
, and possible subjects include “traditional simulation-based projects,” as well as big data and machine learning proposals.
The deadline for proposals is June 22, 2018. See the DOE website for more on proposal
18%
30.07.2019
News, “The data breach that occurred on March 22nd and 23rd this year allowed attackers to steal information of customers who had applied for a credit card between 2005 and 2019.”
Capital One had
18%
20.08.2019
in a shipping container. The $12 million IBM system will include an on-board uninterruptible power supply, chilled water cooling, and a fire suppression system. The system comes with 22 nodes for machine learning