31%
05.12.2014
.519354 pkts=6 kpps=0.0 kbytes=0 mbps=0.0 nic_pkts=16 nic_drops=0 u=2 t=2 i=0 o=0 nonip=2
1415510244.519597 pkts=6 kpps=0.0 kbytes=0 mbps=0.0 nic_pkts=22 nic_drops=0 u=2 t=2 i=0 o=0 nonip=2
1415510247
31%
05.09.2011
an open port. Once you find out what operating system is running on the target system, you can anticipate how the system will react:
# ettercap -Tq -P finger /192.168.1.121/22
To allow the p0f utility
31%
03.02.2022
1: +DP-2-2 1080/510x1920/287+0+0 DP-2-2
2: +DP-2-3 1920/598x1080/336+1080+0 DP-2-3
You can use xrandr -q to see which modes the individual devices support. You can then set the desired mode
31%
05.12.2014
$600/EUR675
Hardware
Processor
Intel Celeron J1800, 2.41GHz (dual core)
Marvell Armada XP (PJ4Bv7), 1.066GHz (dual core)
Intel Atom D2550, 1.86GHz (dual core
31%
17.09.2013
's leading 22nm manufacturing process. Equipped with up to 12 cores, the new chips support a variety of computationally intensive workloads, with performance gains of up to 50 percent.
The Intel Xeon E5-2600 v
31%
03.06.2014
of a quantum computer. According to Google, the Quantum Computing Playground “can efficiently simulate quantum registers up to 22qbits, run Grover’s and Shor’s algorithms, and has a variety of quantum gates
31%
17.07.2013
17-22, 2013. See the SC13 website for SC13 submission information.
31%
21.06.2012
or partner (42 percent), utilize the IT system in place (33 percent), or search online and download a free solution (27 percent).” Additionally, 22 percent of respondents have not implemented policies
31%
12.07.2017
the following highlights:
artificial intelligence – delivers 2.2 times higher deep-learning training and inference compared with the previous generation
networking – up to 2.5 times increased IPsec
31%
14.06.2018
-ranked Oak Ridge system. Summit is also capable of performing up to 3 billion mixed-precision calculations per second (3.3exaops).
The Summit system includes 4,608 compute servers, each with two 22-core IBM