18%
28.11.2021
. The developer's apps then integrate seamlessly into Platform as a Service (PaaS) environments in the style of microarchitecture applications on the basis of OpenShift, Rancher, and the like and simply work
18%
30.11.2025
/0K /s] [4137 /0 iops] [eta 00m:06s]
In the example, the first job is performing a sequential read, marked as r in square brackets, while Fio hasn't initialized the second job, marked as P
18%
28.01.2014
edition, which was published early last year. The first edition, available online refers to Lua 5.0. The language has now moved to version 5.2, but the online book is still up to date to a large extent
18%
22.10.2018
vulnerabilities within FreeRTOS’s TCP/IP stack and in the AWS secure connectivity modules. The same vulnerabilities are present in WHIS Connect TCP/IP component for OpenRTOS\SafeRTOS,” wrote Karliner in a blog post
18%
14.03.2013
European Cybercrime Center
The European Commission has established a European Cybercrime Centre (EC3) at Europol. According to the announcement, the EC3 will be the focal point in the EU's fight
18%
29.10.2013
Waiting for environment "DanApp-env" to launch.
2013-05-08 20:02:27 INFO createEnvironment is starting.
2013-05-08 20:02:32 INFO Using
elasticbeanstalk-eu-west-1-894012917938 as Amazon S3 storage
bucket
18%
07.10.2014
. The second number is percent CPU load from the system (0.3%sy), and the next is percentage of jobs that are "nice" [2] (0.0%ni). After that, Top lists percent overall CPU time idle (86.3%id; four real cores
18%
18.02.2018
2016, you can also use storage replication to replicate an entire S2D directly to other clusters and data centers. A TechNet blog post [3] explains how the fail-safe mechanism for S2D and the associated
18%
18.04.2012
Solution includes pre-configured hardware to match requirements for running Cloudera’s Distribution of Hadoop. The bundle consists of one Name Node and three Data Nodes in a multi-rack architecture, along
18%
10.01.2013
as enable a new approach to the science and engineering applications that run on them.”
The XPRESS project is funded at US$ 2.3 million a year for three years by DOE’s Office of Science. The project team