68%
30.11.2025
-certs, make, gcc, and g++. The certificates from ssl-cert will be required later.
According to the how-to http://1, Chef prefers RubyGems version 1.3.6 or newer, but not 1.3.7. This version contains a bug
68%
30.11.2025
also frequently provides the underpinnings for a virtualization cluster that runs multiple guests in a high-availability environment, thanks to Open Source tools such as Heartbeat [2] and Pacemaker [3
68%
30.11.2025
to install RADOS and Ceph. Ceph, which is a plain vanilla filesystem driver on Linux systems (e.g., ext3 or ext4), made its way into the Linux kernel in Linux 2.6.34 and is thus available for any distribution
68%
30.11.2025
version with advanced capabilities is available for EUR 49. A feature list [3] specifies the differences between the free and pro versions.
The terminal function supports anti-aliasing, fonts, and macros
68%
30.11.2025
costs
157
303
Production downtime costs
0
0
TCO
7,847
3,709
Like sole proprietors, small business don't have their own IT departments ... 3
68%
30.11.2025
ID.
Version 3.0 of the cluster suite (in RHEL 6 and Fedora 10 or later), replaces OpenAIS with Corosync [3]. Viewed superficially, not too many changes are seen between the two cluster managers ... 3
68%
30.11.2025
, POP3, or DNS. Thanks to its integrated SNMP trap and Syslog receiver, OpenNMS is capable of implementing centralized logging. Performance data can be collected via SNMP, WMI, HTTP, JMX, JDBC
68%
30.11.2025
Include {
13 File = /usr/sbin
14 Options {
15 Signature = MD5
16 }
17 }
18 Exclude {
19 File = /var/lib/bacula
20 File = /tmp
21 }
22 }
23
24 Messages {
25 Name = Daemon
26
68%
30.11.2025
a test page where you can test your dual-stack connectivity (Figure 3). The test shows you clearly, and in real time, whether you can access a number of dual-stack test servers. If all of this works, you
67%
30.11.2025
Scenarios:
21 cucumber /usr/lib/nagios/plugins/cucumber-nagios/checks/features/www.xing.com/startpage.feature:4 # Scenario: Visiting home page
22
23 1 scenario (1 failed)
24 4 steps (1 failed, 3 skipped)
25 0 ... 3